消息称老熟妇乱视频一区二区,99久久无码一区人妻A黑,好吊视频一区二区三区,久久久久人妻精品一区三寸蜜桃

產(chǎn)品banner
Your current location: Index >> 吳中Converter station

吳中Heavy truck replacement power station

吳中Heavy truck replacement power station
Detailed:


New energy vehicle power station


新能源汽車換電站

Solve the core pain points of electric vehicles and help electric vehicles accelerate penetration


Pain point 1: The number of trams exceeds 6.5 million, and fast charging brings the problem of grid expansion


Pain point 2: battery life anxiety, charging time, charging inconvenience




Vehicle-electric separation: with the two advantages of cost reduction and efficient replenishment


Advantage 1: Under the vehicle-electric separation mode, the z high purchase price can be reduced by half, and the purchase of electric vehicles can achieve parity.


Advantage 2: The industry pattern is gradually clear, and battery standardization is in the common interests of all parties


Advantage 3: Car companies break the ice, electric models gradually increase, safety standards continue to establish, and 2H21 policy pilot can be expected




Power change mode: How much space does the power change station have?


In 2025/2030, electric replacement models accounted for 30%/60% of new energy vehicle sales.


In 2025, there will be a demand for 22,000 power stations, and the market size of the operating side will be 263.1 billion


The power station equipment market is expected to reach 69.3 billion in 2025, with a CAGR of 81% in 21-25 years. With the equipment investment scale of 261 million yuan and 4.2 million yuan for passenger cars and heavy truck power stations, the equipment demand market will reach 69.5 billion yuan in 2025, and the market prospect is considerable.






換電站


National standard process for battery replacement


換電站


Battery replacement trend analysis


換電站

Previous:Bus change station2023-07-29

Recently Viewed:

桁架機(jī)械手
亚洲AV日韩AⅤ无码色老头| 亚洲AV无码日韩AV无码导航| 成人无码一区二区片| 日韩精品内射视频免费观看| 亚洲AV永久无码精品网站| 国产又色又刺激高潮免费视频|